Optimal Site Selection of Construction Waste Based on Hydrogeomorphological Indicators Using a Fuzzy Model Case Study: the 15-km Surrounding Area of Damghan City

Document Type : Original Article

Authors

1 Associate Professor, Department of Geomorphology, School of Earth Sciences, Damghan University, Damghan, Iran.

2 Assistant Professor, Department of Natural Resources and Environmental Engineering, Faculty of Agriculture, Shiraz University, Shiraz, Fars, Iran

10.22034/hyd.2026.73209.1856

Abstract

Construction waste is one of the serious environmental challenges facing cities, and improper management leads to contamination of soil, water, and air resources and threatens public health. The aim of this study is to identify optimal zones for the management of construction waste in the city of Damghan, based on hydrogeomorphological indicators and using a fuzzy model within a Geographic Information System. Thirteen information layers were collected and harmonized as the required data. Each layer was fuzzified using linear increasing and decreasing membership functions, and the layers were then combined using the fuzzy gamma operator (γ = 0.9). The final map was validated through spatial comparison with Google Earth satellite imagery and by comparison with similar studies. Approximately 14 percent of the 15-kilometer study area around Damghan city (about 138 square kilometers out of a total of 993 square kilometers) is suitable for construction waste management. The optimal zones are concentrated mainly in the southwest of the city and appear as patches in its east, between the railway line and the Damghan–Shahroud road. Integrating the fuzzy model with a Geographic Information System provides an efficient approach to multi-criteria decision-making for construction waste siting, and the proposed zones in southwestern Damghan, considering hydrogeomorphological and environmental criteria, are the best options for sustainable waste management in this city. It is recommended that uncontrolled dumping around Golestan Township and the Damghan–Isfahan road be brought under control, and that geotechnical studies and socio-economic assessments be conducted before implementation.

Keywords

Main Subjects



Articles in Press, Accepted Manuscript
Available Online from 16 November 2026
  • Receive Date: 24 June 2026
  • Revise Date: 14 November 2026
  • Accept Date: 16 November 2026